Control System Upgrade with 3 Weeks of Machine Downtime

Control System Upgrade with 3 Weeks of Machine Downtime

Project Overview

AG Controls completed a control system upgrade for an automotive manufacturer based in Yorkshire (UK).

The work was prepared in advance and executed during a planned shutdown.

Total machine downtime was limited to 3 weeks, after which the line returned to production.

The Starting Point

Two main issues were identified.

Obsolete servo system

  • The existing servo drives were no longer available
  • Spare parts were sourced from secondary markets

Legacy PLC software

  • Based on STEP7 (classic) with STL code
  • Difficult to read and modify
  • Limited structure for sequence control
  • Troubleshooting required specific experience

 

Scope of Work

  • Removal of the existing control panel and wiring
  • Installation of 9 servo drives
  • Installation of 5 HMI stations
  • New control cabinet build
  • Full electrical design
  • New PLC software
  • Mechanical adapters for servo integration

Control System

The system was rebuilt using:

  • Siemens S7-1500 PLC
  • ET200SP I/O
  • Profinet network
  • Integration with existing devices over Profibus

Operator panels:

  • Siemens Unified HMIs (MTP series)

Software

The new software was developed in:

  • TIA Portal
  • Graph for sequence control

This provides:

  • Clear sequence structure
  • Easier diagnostics
  • Simpler future changes

Mechanical Constraints

The existing machine layout was kept.

New servo drives were integrated using custom adapter plates – designed at AG Controls , without modifying the main structure.

Execution

Most of the work was completed before the shutdown.

  • Electrical design
  • Software development
  • Documentation including 116 pages of schematics and layouts

On-site work included:

  • Strip-out
  • Installation
  • Commissioning

Result

  • 3 weeks downtime
  • Machine returned directly to production
  • Obsolete components removed
  • System easier to maintain

Feedback

“This was one of the best upgrade projects I have seen.”

Controls Engineer

Summary

The main goal was to remove risk caused by obsolete components and simplify maintenance.

The upgrade was completed within a defined shutdown window and without changes to the machine layout.

Need to upgrade existing equipment?

If you are dealing with:

  • Obsolete drives or control hardware
  • Limited spare parts availability
  • Difficult-to-maintain legacy software

AG Controls can support both engineering preparation and on-site execution within a planned downtime window.